When Sacred Heart Rehabilitation Center needed to add air conditioning to a 50-year-old, three-story facility to meet state funding requirements, SysTemp Corp engineered a smarter path forward. Rather than a costly full replacement, our team converted the building to a water source heat pump system and reused the facility’s existing piping network, cutting roughly $800,000 from construction expenses.
We also implemented a power monitoring system to keep electrical loads within state-approved limits. The result: full compliance, better comfort for occupants, and major savings. That’s the kind of creative problem-solving your building gets with SysTemp Corp.